Our industry expert and EV evangelist Chris Chamberlain shares four key steps that successful Charge Point Operators (CPOs) follow when building commercially profitable sites, from identification to construction.
The strategic selection of EV charging sites is critical to ensuring widespread accessibility, user convenience, and the overall success of the EV ecosystem; not least the charging anxiety that is slowing EV adoption.
This article outlines the four key stages of EV charging site selection: Identification, Site Assessment, Site Acquisition, and Design/Construction. Each stage involves meticulous planning and execution, with only a small percentage of potential sites ultimately reaching the construction phase. By understanding and optimizing these stages, companies can enhance by improving the process, their efficiency and success rate in deploying EV charging stations.
The first stage in EV charging site selection is Identification. This stage involves locating “white space” on the map—areas currently underserved by existing charging infrastructure. Identifying these gaps is crucial for maximizing coverage and ensuring that EV users have convenient access to charging stations wherever they travel.
This stage may not be required if a specific list of potential sites is already available, either from a client or identified through prior analysis.
Once a list of potential sites is established, either through white space analysis or client input, the next stage is a thorough site assessment. Site Assessment is a critical stage, where potential locations are evaluated for their feasibility and viability. This involves a thorough examination of various factors to ensure the site meets the necessary criteria for an EV charging station.
Viability: This evaluates the commercial viability of the site. Factors to consider include:
Feasibility: Here, the focus is on the physical suitability of the site. Key considerations include:
Failing to complete these evidence based checks and assessment will result in the wrong chargers going in the wrong locations i.e. they won’t be profitable!
Once feasible sites are identified, the focus shifts to Site Acquisition. This stage involves negotiating with property owners, understanding zoning and regulatory requirements, and estimating the costs associated with developing the site. This stage also involves detailed financial modeling to determine the projected return on investment for each shortlisted site. Only locations with a strong financial justification move forward to the final stage.
The final stage is the construction and installation of the charging station itself. This involves several critical tasks to ensure the station is operational and meets all safety and performance standards.
It’s important to acknowledge the reality of the selection process. Due to various constraints, only a small percentage (estimated around 2%) of initially considered sites ultimately become operational charging stations. If we consider an optimistic scenario of a 2-5% go-through rate an operator would have to look at at least 4000 sites to deploy 200.